Name
|
Done
|
Plan
|
Shing
|
- Week W36 (09/01~09/07):
- Learned B2G-flash-tool.
- Smoketest 2.0.
- Walked through gaia-ui-test tutorial on MDN.
- Learned how to file bugs with Bugzilla.
- Looked into Bug 921965.
- Finished various new-hire-related tasks.
|
- Week W36 (09/08~09/12):
- Follow up on Bug 921965.
- Find more qawanted bug to participate.
- Try to fix Bug 1034780 as a practice for the gaia submittion flow.
- Prepare for study group sharing.
|
Paul
|
- Review test case patches
- Lab scale-up plan
- Feedback arima for browser test cases
- Add log timestamp in mtbf-v2.0 branch
- Crash report patch
|
- Trigger first test run on v2.1
- Modify crash report patch based on review
- Followup lab setup issue
-- backlog --
- Followup live test run stream
- Datazilla integration
- Bug fix for in-testcase logging
- Draw figure to intro. mtbf
|
eric
|
- Week W36 (09/01~09/05):
- Sign off v2.1 landed features
- Take over Dialer, Contacts features from Johan
- Create test cases for bug 877971
- Create test cases for bug 1042591
- Smoketest support for 9/1, 9/2
|
- Week W37 (09/09~09/12):
- Test Run for COMMS
- PTS v2.1
- Help with full run
|
Gerry
|
- Week W36 (09/01~09/05):
- v2.1 Finish creating test case - bug 1024776 - Support for EU Internet APN
- Smoketest support for 9/1, 9/2
- Finish testing bug 1035250
- Finish testing bug 1026098
- Verify 2.1 bugs
|
- Week W37 (09/09~09/12):
- Start to test bug 1024776
- Start to test bug 1023818 - [User Story][Lockscreen] Taking action on lock screen notifications
|
Mike
|
- Week W36 (09/01~09/05):
- Categorize test cases from version tags (70%)
- Test case mind map creation
- Flame KK v1.4 release candidate verification: v167
- Madai bugs verification
|
- Week W37 (09/09~09/12):
- Categorize test cases from version tags (cont.)
- Test case mind map creation
- Flame KK v2.0 base image verification
- Madai bugs verification
|
Hubert
|
- Week W36 (09/01~09/05):
- Execute Woodduck regression test
- Follow up Woodduck tasks and issues
- Woodduck weekly meeting
- Plan Woodduck Automatic testing.
|
- Week W37 (09/09~09/12):
- Execute Woodduck regression test
- Follow up Woodduck tasks and issues
- Woodduck weekly meeting
- Plan Woodduck Automatic testing
- Woodduck triage meeting
- Execute Woodduck 2nd test run
|
Al
|
- Week 36 (09/01~09/05):
- Monkey Test stability run on local PC - Passed
- Support Woodduck Issues
- Local Vixen build verification on Mac
|
- Week 37 (09/09~09/12)
- Check issues found on Vixen w/ TAM & partners
- Monkey Test migrates to TWCI-Jenkins and changes to v2.1 (Flame)
- Tools for collection logs
|
Alison
|
- Week 36 (09/01~09/05):
- Bugs verification
- Sign off v2.1 landed features
- Smoketest support for 9/1, 9/2
- Full run test - [Devices] Test Media Transfer Protocol (MTP) (bug 922927)
- Full run test - [Ringtones] Test transfer ringtones from SD card to ringtones folder (bug 1027995)
- Full run test - [NFC] Test tap-to-pay user story (bug 979152)
|
- Week 37 (09/09~09/12)
- Update test cases - Bug 979157 [B2G][NFC][User Story]: Tap-to-go (using MIFARE 1k) functionality to pass through gates
- Update Wiki for how to use MIFARE discover software which is provided by NXP (http://mzl.la/1wdz0i6)
- Prepare NFC workweek QA session
|
Askeing
|
|
- Week 37 (09/09~09/12)
- Develop the combo-runner framework.
- Refactoring the scripts of MTBF/CI.
- Develop the flashing tools.
- Prepare the information of outsourcing.
|
Cynthia
|
|
- Week 37 (09/09~09/12)
- Execute Woodduck daily smoke test
|
Walter
|
- Week 36 (09/01~09/05):
- Bug works
- Create 10+ test cases
- Review pull requests
- other meetings and new stuffs
- lab environment, phone setup, phone flash, other setup
- Prepare devices for MBTF test
|
- Week 37 (09/09~09/12)
- Bug works
- Review pull requests
- lab environment, phone setup, phone flash, other setup
|
William Hsu
|
- Week W36 (09/01~09/05)
- [Routine] Bug replication, submission, and verification.
- 14 bugs from the time of the writing of this (Ref: http://goo.gl/hwB40h)
- [Device] Assist device related tests - Dolphin
- Combination testing ( Ref: http://goo.gl/t8dEqw )
- [Device] Assist device related tests - Tako
- Gaia UI test
- Set up IIS server for Tako Flash tool (Server side)
- Install Tako flash tool and collect license key request (Client side)
- Write down the installation guide of FG3 tool - (Ref:http://goo.gl/pe8iQf)
- Discussing Tako automation related problems with partner
- MTBF
- B2Gperf
- Gaia UI Test
- Others,
- One day PTO (9/5)
- Collect system information (shipped devices) for Mozilla metrics team
|
- Week W37 (09/08~09/12)
- [Device] Assist device related tests - Dolphin
- Help partner to review E.ME performance.
- [Device] Assist device related tests - Tako
- Install FG3 server on VM and deploy it to Amazon EC2 with authentication mechanism protected
- Install FG3 client on VM and share with MTV office
- Smoketest on Tako
- Others,
- National holiday (9/08)
- Team Building (9/11)
|