Firefox OS/DeviceQA/2014-10-13WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W42 (10/13~10/17):
    • MCTS study and testing on master
    • Africacom support
    • Tarako performance issue support
  • Week W43 (10/20~10/24):
    • MCTS testing on v2.0
Alison
  • Week W42 (10/13~10/17):
    • Bugs verification
    • Update DSDS gaia-ui-test case for bug 980757
    • Study [SIMalliance] Open Mobile API Test Specification
    • Test cases categorization for NFC
    • Test cases categorization for Media (Ringtones part)
  • Week W43 (10/20~10/24):
    • Bugs verification
    • Test cases categorization for Peripherals
    • Predefined NFC Secure Element API test spec
Askeing
  • Week W42 (10/13~10/17):
    • Visit outsourcing partner.
  • Week W43 (10/20~10/24):
    • Resolve the problems of outsourcing. (generate/upload builds, flashing...etc)
    • Follow up the valid way of flashing Gaia/Gecko and backup/restore. (Bug 1050282, 1078710)
    • Follow up the Card UI user story.
Cynthia
  • Week W42 (10/13~10/17):
    • Take care of Flame KK v2.0 automation reports
    • Provide Woodduck daily build
    • Clarify and reproduce Woodduck issues
  • Week W43 (10/20~10/24):
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Clarify and reproduce Woodduck issues
    • Assist Al in testing for Demo Grid and compatibility
    • Support Bug Bash event
Edward
  • Week W42 (10/13~10/17):
    • Productivity - Verify sprint 6 tickets
    • Bugs verfification
    • Write Marionette js auto scripts.
    • Final confirm and trace status of blocking issues in v2.1
  • Week W43 (10/20~10/24):
    • Bug bash event
    • Test cases categorization for Productivity
Eric
  • Week W42 (10/13~10/17):
    • Exploratory against v2.1
    • Verification of bugs
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
  • Week W43 (10/20~10/24):
    • Market customization testing
    • Market customization test case fixing
    • Bug bash preparation badge design
Gerry
  • Week W42 (10/13~10/17):
    • Create app usage metric test cases.
    • (50%) Automate test cases for actions on notification
    • Review smoke tests for SP & OTA
    • Verify bugs.
  • Week W43 (10/20~10/24):
    • Automate test cases for "actions on notification"
    • Test cases categorization for WiFi
    • Verify bugs.
Hubert
  • Week W42 (10/13~10/17)
    • QA outsource partner training (10/13 ~ 10/18)
  • Week W43 (10/20~10/24)
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks and issues
    • Woodduck triage meeting
    • Outsourcing weekly meeting
Mike
  • Week W42 (10/13~10/17):
    • Flame base image verification
      • v188 HW Sanity Test
      • Bug reproduction
    • Others: 4 days PTO
  • Week W43 (10/20~10/24):
    • Flame base image verification
      • v188+PVT Full Flash HW Sanity Test
      • Bug reproduction
    • Suppport Dolphin SD card verification
    • Arrange discussion of topics against MozTrap Ecosystem
Paul
  • Follow up device/graphic issue
  • Prepare Q3 retrospect demo
  • Q4 plan
  • Check incoming request for flash tool
  • download progress for flash tool
  • Bug fix for in-testcase logging
  • Evaluating test solution on mac mini

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Modifying crash report patch based on review
Shing
  • Week W42 (10/13~10/17):
    • Cost Control test cases cleanup.
    • Verify cost control and telemetry bugs.
    • Practiced MarionetteJS test case writing.
    • Practiced Jenkins CI setup.
    • Built geolocation API demo.
    • Built MozTrap helper addon.
  • Week W43 (10/20~10/24):
    • Verify cost control bugs.
    • Support Bug Bash on Fri.
    • Sharing on geolocation API.
    • Smoketest/RAT/TOFT triage for cost control cases.
    • Improve MozTrap helper addon.
Teri
Walter
  • Week W42 (10/13~10/17):
    • Taking care of MTBF lab
      • Set up environment to collect information for CAF
    • Taking care of Bugs
      • Bug 1074063 - [MTBF][B2G] white & black screen
      • Bug 1076605 - [MTBF][App Launch] Apps can't be launch
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1070199 - [System][KK] After flashing the screen intermittently becomes corrupted
      • Bug 1083691 - [MTBF][B2G][Crash Report] B2G 34.0 Crash Report [@ XPCConvert::JSData2Native(void*, JS::Handle<JS::Value>, nsXPTType const&, nsID const*, tag_nsresult*) ]
      • Bug 1084179 - [MTBF][B2G][Stability][Camera] Camera App will be black with button visible
  • Week W43 (10/20~10/24):
    • Django investigation
    • Bug bash
    • Taking care of Bugs
      • Bug 1074063 - [MTBF][B2G] white & black screen
        • Resolved Fixed, waiting for uplift to v2.1
      • Bug 1076605 - [MTBF][App Launch] Apps can't be launch
        • Couldn't reproduce it
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • There is a patch on Bug 1079810.
      • Bug 1070199 - [System][KK] After flashing the screen intermittently becomes corrupted
        • It's on TMobile now
      • Bug 1084179 - [MTBF][B2G][Stability][Camera] Camera App will be black with button visible
        • blocking by other issues.
William Hsu
  • Week W42 (10/13~10/17)
    • [Routine] 33 bug from the time of the writing of this (Ref: http://goo.gl/yAqbYH)
    • [Device] Assist device related tests - Tako
      1. Assign Tako's bugs to developers and stakeholders.
      2. Executing Gaia UI test on Tako ES2 build (ETA: 10/14)
      3. Executing smoketest on Tako v2.1 pre-release build (ETA: 10/16)
      4. Weekly meeting with partner (10/14)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      3. New Flame base image verification (v188)
      4. Answer flame's inquiries (Wesly & Partners)
    • [Device] Assist device related tests - Tarako
      1. Performance evaluation of Tarako commercial build, 10/15~10/16 (Ref: http://goo.gl/R7mK17)
  • Week W43 (10/20~10/24)
    • [Device] Assist device related tests - Tako
      1. Assign Tako's bugs to developers and stakeholders.
      2. Help address b2gperf's problem -> Request from partners (ETA: 10/20)
      3. Executing Gaia UI test on Tako v2.1 pre-release build (ETA: 10/21)
      4. Executing smoketest on Tako v2.1 pre-release build (ETA: TBC)
      5. Weekly meeting with partner (10/21)
      6. Tako v2.1 Test Plan
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • [Device] Assist device related tests - Dolphin
      1. Answer flame's inquiries from Marvin (Marvin & Partners)