Firefox OS/DeviceQA/2014-11-17WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W47 (11/17~11/21)
    • Three days off and QA Team building for one day
    • MCTS for Stringray project discuss
  • Week W48 (11/24~11/28)
    • MCTS for Stringray project implementation
      • Planning and implementation
      • Certificate Permission App
Alison
  • Week W47 (11/17~11/21)
    • Practice Marionette JS for API testing
    • Prepare simple SE API test case for DT
  • Week W48 (11/24~11/28)
    • Verify bugs
    • Trouble shooting for SE API testing issue by marionette JS (DT execute)
Askeing
  • Week W47 (11/17~11/21):
    • Follow up Woodduck build issue.
    • Mozilla Certificate Test Suite
    • Connected Devices meeting.
    • Plan Gaia Build process with Gaia team.
    • Android L Porting.
  • Week W48 (11/24~11/28):
    • Device Builds discussion.
    • Plan Gaia Build process with Gaia team.
    • Android L Porting.
    • Follow up Woodduck build issue.
    • Mozilla Certificate Test Suite discussion.
    • Connected Devices meeting.
Cynthia
  • Week W47 (11/17~11/21)
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Test/verify bugs for Woodduck
    • Power consumption planning / discussion
      • Optimize Radio Use while in Sleep Mode (Bug 1098316)
      • Disable GPS When not in use or in foreground (Bug 1093618)
      • Enable WiFi Low Power Mode by default (Bug 1084156)
  • Week W48 (11/24~11/28)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Test/verify bugs for Woodduck
    • Generate test cases for Power consumption
      • Optimize Radio Use while in Sleep Mode
      • Disable GPS When not in use or in foreground
      • Enable WiFi Low Power Mode by default
Edward
  • Week W47 (11/17~11/21)
    • Power consumption planning / discussion
    • Prepare automation scrum for TPE
    • Verify sprint 8/ 9 tickets of productivity
  • Week W48 (11/24~11/28)
    • Power consumption planning / testing sheet creation / create test case
    • [2.2][SysP] Study 2.2 feature spec
    • [2.2][Prod] Study 2.2 feature spec
Eric
  • Week W47 (11/17~11/21):
    • Code coverage testing checking with RD
      • blanket.js
    • V2.2 Prep
Gerry
  • Week W47 (11/17~11/21):
    • Follow up and verify bugs reported by QAnalyst
    • Start to look at fxosqa-auto-backlog
    • V2.2 Prep
  • Week W48 (11/24~11/28)
    • Follow up and verify bugs reported by QAnalyst
    • [2.2] Study 2.2 feature spec - keyboard
    • [2.2] Study 2.2 feature spec - wifi
Hubert
  • Week W47 (11/17~11/21):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
  • Week W48 (11/24~11/28):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Audit issue quality filed by Marigold
    • Create OTA test document for Marigold.
Mike
  • Week W47 (11/17~11/21)
    • Power consumption task:
      • Test method discussion
      • Test case creation
      • Compare automation tool with Orangutan
      • Power tool sharing
    • Branch management discussion
    • EWC Handover
  • Week W48 (11/24~11/28)
    • Power consumption: Version comparison
    • Follow up v2.1 bugs
Paul
  • mtbf_operation script refactor
  • Investigation for process killer poc
  • Prepare Portland ww sessions

-- backlog --

  • Modifying crash report patch based on review (pending to b2gDevice in mozbase)
  • Followup live test run stream
  • Datazilla integration
  • Chaos Monkey for b2g (random process killer)
  • Memory stress test
Shing
  • Week W47 (11/17~11/21)
    • [MozTrap] Improve frontend JS performance
    • Study ScreenSharingAPI and SyncAPI
    • --backlog--
      • [MozTrap] Uplift JS performance fix to master branch
  • Week W48 (11/24~11/28)
    • [MozTrap] Submit JS modifications to upstream
    • [2.2] Study 2.2 feature spec
    • [2.2] Study 2.2 new API (ScreenSharing and Sync)
    • [MozTrap] Study MozTrap RESTful API
Teri
  • Week W47 (11/17~11/21)
    • Prepare for V2.2 productivity
    • Practice Marionette JS test cases
    • Practice write/run FxOS app.
    • Learn about node.js.
  • Week W48 (11/24~11/28)
    • [2.2] Study Productivity: calendar and email feature spec
      • Test run apps to get familiar
      • Study MozTrap test cases
      • Study RTL specs (including clock)
    • Learn about pairwise testing
Walter
  • Week W47 (11/17~11/21):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • Help T2M with issues
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
        • Help T2M with setting up environment
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
        • lmk.js experiments (some more issues)
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
        • Reproduced in v180 v184 v188 and log provided.
    • Restruct
      • Combo Runner restruct done
      • MTBF restruct in process
  • Week W48 (11/24~11/28)
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
        • Help T2M with issues
      • Bug 1081577 - [Performance][Dialer] lmk.js is wrong in Flame base image
        • lmk.js experiments (some more issues) and need more patches
      • Bug 1094070 - [MTBF][B2G][Camera][Media Server] black camera screen with buttons
        • Reproduced in v180 v184 v188 and log provided.
      • Bug 1076605 - [MTBF][App Launch] Apps failed to launch, stuck at icon splash
        • Customized patches and fixes, now patched.
    • Restruct
      • MTBF restruct in process
    • Portland workweek
William Hsu
  • Week W47 (11/17~11/21)
    • [Device] Assist Tako related stuffs
      • Assign Tako unsolved bugs to developers and stakeholders.
      • Coach Marigold for flashing Tako device.
      • Weekly meeting with partners
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Create jobs (Jenkins) for v2.1 Branch - Automation tests
      • Gaia UI test on v2.1 Build
      • v2.0 Bug verification (verifyme)
    • Others,
      • Team building
  • Week W48 (11/24~11/28)
    • [Device] Assist Dolphin related stuffs
      • Performance evaluation (Smoketest, test-perf, and Gaia UI test)
      • FPS measurement
    • [Device] Assist Tako related stuffs
      • Follow remaining tasks, and close Tako's bug (v2.1 & v2.0)
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Gaia UI test on v2.1 Build
      • Tune GU's testvars (Flame v2.1)
      • v2.0 Bug verification (verifyme)
Hermes cheng
  • Week W47 (11/17~11/21)
    • Study automated testing
    • [2.2] keep studying assigned V2.2 features
      • Study 1098385 specs (OS update), clarify questions with PM, UX team on bugzilla
  • Week W48 (11/24~11/28)
    • [2.2] keep studying assigned V2.2 features
      • Start to design test cases for 1098385 (OS update)
      • Study 1098393 (Task Manager) and clarify questions
      • No spec for 1098376 (flashlight) now, holding
    • [MozTrap] find out unfriendly interaction