Bugzilla Lite
From MozillaWiki
Contents
Program Description
Bugzilla Lite (https://www.bzlite.com/login/) is the mobile view for Bugzilla, allows offline bug filing.
Press and hold VolumeUp + Sleep on Firefox 3.0 to capture logs and a screenshot for bugs (or enable "shake to save system logs" on earlier versions)
Product Requirements:
Enter text here
User Stories and Acceptance Criteria
Title | BUG ID | User story | Acceptance Criteria |
---|---|---|---|
Bugzilla Lite | 1180660 | As a user I want to be able to raise bugs directly from the device so that I can inform Mozilla directly of any of my requirements. | it should be easy to attach logs - it should be easy to attach screenshots - it should receive feedback on the ID of the bug i have raised - it should be easy to get an overview of all the items I have raised |
Program Status
Milestone | Date | Status |
---|---|---|
Milestone 1 | ON TARGET | |
Milestone 2 | CHALLENGED | |
Milestone 3 | AT RISK |
Status Key
Color | Status | Key |
---|---|---|
On Target | The project or deliverable is expected to meet its due date. | |
Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
Done | The project or deliverable has been completed. | |
On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
Querying by 2.6+ features
(please add correct bug tracking number)
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
---|---|---|---|---|---|---|
Program Stakeholders
Role | Name | IRC |
---|---|---|
EPM | Nicole Yee | nicoleyee |
EM | Gregor Wagner | gwagner |
PM | Wilfred Mathanaraj | wilfred |
TL | ||
UX | Jacqueline Savory | jsavory |
QA | NoJun Park | njpark |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance