CloudServices/Meetings/2010-04-27
From MozillaWiki
< CloudServices | Meetings
Agenda:
- Follow ups from last week:
- mrz will add HA testing to the qa checklist (what happens when we lose a cable etc)
- We need to triage add-on reviews. Ragavan and Justin to work on that.
- Status: Don't have a plan yet.
- We need a support plan. Ragavan and Tenser to work on that.
- Status: Tenser and Ragavan met and are working on a plan for getting SUMO KBs in place.
- Figure out if we can make string changes to the name for 1.3 or if we will need a 1.4.
- Status: Done. We'll call 1.3 Firefox Sync.
- Release checklist from Matt.
- Updates:
- Client
- 1.3b1
- Code complete by Apr 30
- UI/UX work
- l10n
- Sync server
- Registration server
- Account creation/credential separation?
- Made progress on a new private HTTP API (bug 560588)
- ...but aravind's LDAP ACL changes may make it unnecessary?
- Account creation/credential separation?
- QA
- Client:
- Weave1.3b1 Testday went well. (12 bugs filed, 3 already fixed in 1.3b2)
- Currently executing the 1.3 client test plan against 1.3b2
- Load:
- Load Testplan here.
- Includes Release checklist. Will be sent out after meeting for review.
- Working on a modified testplan for uTest to follow during load testing week
- Thick client automation (jgriffin)
- Python testrunner work completed. Can now run end to end user created tests to test bookmark sync
- Overview and builds are up.
- captcha bug 560364 fixed, thanks zandr
- next week: extension code to allow tests for other syncs (passwords, history, tabs, etc.)
- Client:
- Ops
- iPhone client
- Release schedule
- Code freeze (for blockers): Apr 30
- Registration server code complete: Need date from Les
- String Freeze: Apr 30
- H/W set up complete and configured: May 5
- Load testing done : May 13
- l10n complete: May 11
- Security reviews done: May 10
- RC release date: May 12
- QA release sign off: May 13
- Unit tests for Primary done: May 10
- Web content finalized and staged: May 13
- PR/Announcement complete and finalized: May 13
- GA date: May 17, 2010
- Client
Notes:
- mrz has added to the checklist, racking being done now, may be a day ahead.
- Matt is going to require some feedback his checklist, will send email out today.
- 1.3b1 was a first cut at addressing usability issues. More iterations to come on the first and last screens. Should be wrapped by end of this week.
- Had to do an early 1.3b2 (along with 1.2.2) to address trunk breakage.
- Plan is to release 1.3b3 by end of this week, with no blockers (feature, ui and string freeze)
- Client gut check feels like it's on track says mconnor.
- l10n is blocking on string freeze.
- Sync server is code complete for 1.3 launch. Migrations are done per user.
- memcache is in stage and will be load tested against production.
- quotas can be tested against stage.
- security reviews for sync server will start and have it done by next week.
- les needs some reviews on his registration patch, unsure how aravind's acl changes affect him.
- toby/les/clyon to sync up and will get a date.
- See updates above. Test day got 12 bugs, 3 already fixed.
- Thick client testing is not 1.3 blocker.
- uTest contracts are in legal review.
- May 17 production migration checklist (owner: zandr)
- Marketing plan is going to be slowly ramped up, so we can dial up/down based on feedback. Also expecting the iPhone client to help get users.
- iPhone client project page: https://intranet.mozilla.org/Mobile/iPhoneWeaveClient1.0