  • Time: Wednesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
  • Place: Mozilla HQ, 2J (JK)
  • Phone (US/Intl): 650 903 0800 x92 Conf: 8616#
  • Phone (Toronto): 416 848 3114 x92 Conf: 8616#
  • Phone (US): 800 707 2533 (pin 369) Conf: 8616#

Technical

Ops

  • SLC2
    • Blocked on netops (Vlan setup)
    • Ability to ramp up more servers?
      • power
      • switch config
      • ~3 hours to get a rack of machines configured (read for ks)
      • ACTION: jv to work with Layer42 on temp spin up & prep work
  • Question from mconnor: Current queue for ops projects (have a lot of stuff in play, not clear what's current, should re-align if needed)
  • atoll ff4 blockers:
    • account-portal
    • admin-scripts
    • jpake logging
    • jpake benchmark
    • standalone memcache servers

Engineering

See yesterday's meeting notes for detailed status on projects.

Metrics

Product

Security

  • Update on 3rd party testing
  • Security Blocker - Bug 624048 - Attacker IP address incorrectly reported for all j-pake CEF events

Roundtable

Notes and actions

  • Do a simulation of 10 million new activations over a 24 hour period? Given we have tons of extra capacity?
    • Need to push on this, is there a bug?

Follow ups from last week

  • Jeff/MConnor will drive the load test to simulate 10M new user activations over a 24 hour period.
  • Ragavan will follow up with Marketing to see if there are better numbers for how many J-PAKE activations to expect on launch day.
    • Status: We are still working on updating numbers. Current plan is to *not* simul-ship desktop and mobile, which means activations will be more spread out than anticipated. Also, we are getting revised estimates for downloads (not planning on doing a download day style push for launch). Sorry this is changing a lot, but I'll keep giving updates as and when I know stuff.
  • atoll will provide numbers based on logs on current J-PAKE servers
  • MConnor/Ragavan will work on communicating regular status on Sync blockers for Fx 4.
  • We won't be pursuing perf benchmarks until we get all Fx 4 blockers done.

Fx 4 client

Fx 4 server

Other issues

  • F1 (justin)
  • Product roadmap - Ragavan is still working on getting an integrated roadmap across desktop/mobile/apps. Near term roadmap for Sync (for next 3-12 months) should be available within the next week. Roadmap for other services (Identity, Data sharing) will come a bit later after PM offsite (working on dates).