Firefox3/StatusMeetings/2006-06-07

From MozillaWiki
Jump to: navigation, search

index | next week>>

Meeting Details

  • 11:00am PDT (18:00 UTC)
  • Mozilla HQ, 1st floor conference table
  • +1 866 216 2181 (or +1 303 228 0514)
  • join irc.mozilla.org #granparadiso for backchannel

Agenda

  1. 1.9/Gran Paradiso Schedule
  2. Developer Roundtable
  3. Any other business

1.9/Gran Paradiso Schedule

  • Need development focus on regressions
  • todo: need to figure out complete gecko 1.9 feature list
    • vlad to consolidate all web pages related to gecko 1.9 into a single feature list
  • mac needs 2 months before it can be ready for alpha
    • 1 month until turn-on
    • 2-3 weeks after that for bug shakeout
  • major milestones
    • mac cocoa widgets
    • mac cairo
    • 1-2 months
  • parallel work before the "sync point"
    • mac
    • trunk regressions
    • roughly start of August for the sync point
  • dbaron: reflow needs 2 months of dedicated time
  • can maybe do it in parallel, depending on dbaron's time; bz is helping; mats could help

Developer Roundtable

  • High-visibility Gecko 1.9 features:
    • Cairo everywhere
    • Cocoa widgets on mac
    • Reflow branch
    • JS1.9
    • E4X4DOM
    • Language-agnostic DOM
    • XBL2
    • Event queue rework
    • Firefox on XULRunner
    • SVG improvements
  • Firefox 3 features:
    • Places
    •  ???

Other Business

Todo List

  • Feature list wiki consolidation: Vlad
  • Feature/project list additions: everyone
  • Triage 1.9a1 regression/blocker list
  • Firefox 3 needs from Gecko 1.9