Firefox OS/DeviceQA/2014-09-22WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Hubert
  • Week W39 (09/22~09/26):
Cynthia
  • Week W39 (09/22~09/26):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
  • Week W40 (09/29~10/03):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
Gerry
  • Week W39 (09/22~09/26):
    • Test App usage metrics
    • Finish EU-support test
    • Verify 2.1 bugs
Mike
  • Week W39 (09/22~09/26):
    • Test case mind map creation
    • Tarako power drain issue follow up
    • Madai bug verification
    • Project management training
  • Week W40 (09/29~10/03):
    • Flame base image verification: v184
    • Madai bug verification
    • Extend Orangutan capability
    • 3rd party app performance measurement
eric
  • Week W39 (09/22~09/26):
    • Test Run for RIL
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Fixing RIL/COMMS test cases
  • Week W40 (09/29~10/03):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before CC
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
Paul
  • bug 1064800 - Re-test on master and v2.1
  • Fix test case error
  • Trigger full run on v2.1
  • bug 1064800
  • Setup device for flame_kk
  • Workaround for v2.0 software home button
  • Fix test case error
  • Patch for reusing marionette instance
  • Trigger custom build run for patch 1064800
  • Modify crash report patch based on review

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
William Hsu
  • Week W39 (09/22~09/26)
    • [Routine] Bug replication, submission, and verification.
    • [Device] Assist device related tests - Tako
      • Smoketest on Tako (ETA:9/25)
      • Gaia UI test on Tako (ETA:9/23)
      • Test strategy for CAF ES2 build (v2.0)
      • Prepare All-in-one test machine/VM for partner (Part I: Packages installation 9/26)
      • Weekly meeting with partner (9/23)
        1. Address automation test related problems
        2. Three-way synchronization with partners (progress)
    • [Device] Assist device related tests - Flame
      • Prepare jobs for Flame KK
      • Gaia UI test on v2.0 Build
      • Analyze problem of rescue tool
  • Week W40 (09/29~10/03)
    • [Device] Assist device related tests - Tako
      • Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
      • Smoketest on Tako (ETA:10/02)
      • Gaia UI test on Tako (ETA:9/30)
      • Weekly meeting with partner (9/30)
        1. Three-way synchronization (project status)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
Alison Shiue
  • Week W39 (09/22~09/26)
    • Bugs verification
    • [Bluetooth] Update test cases at mozrtrap
Al
  • Week W39 (09/22~09/26)
    • Woodduck weekly triage
    • Privacy Panel Feature for v2.1
    • MCTS for v2.0/v2.1
    • Monkey Test
Walter Chen
  • Week W39 (09/22~09/26)
    • Bug solving for mtbf
    • MTBF test runs*2
    • interviews
Shing
  • Week W39 (09/22~09/26)
    • Apps usage metrics testing
    • Cost Control testing
    • Cost Control test cases design
    • Cost Control performance regression investigation
  • Week W40 (09/29~10/03)
    • Cost Control test cases design
    • Apps usage metrics test cases design
    • Read Pragmatic Software Testing
    • Prepare sharing on how to submit app to Firefox Marketplace
Edward
  • Week W39 (09/22~09/26)
    • Test/ verify sprint 5 tickets
    • Plan rearrangement resource for feature owner.
    • Smoke test for productivity apps with KK image
Askeing
  • Week W39 (09/22~09/26)
    • Develop the combo-runner framework.
    • Investigate the MCTS.
    • Fix the building/testing jobs on CI server.
    • Develop the flashing tools.
    • Prepare the information of outsourcing.
  • Week W40 (09/29~10/03)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.