Firefox OS/DeviceQA/2014-09-29WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W40 (09/29~10/03):
    • Bug 1074612 getUserMedia issues solving
      • New Testing github Repo at mozilla-b2g
      • Generate testing cases in excel format to partners
    • Kick off drafting on FC/CC criteria checking list
  • Week W41 (10/06~10/10):
Walter
  • Week W40 (09/29~10/03):
    • Bug solving for mtbf
    • MTBF test runs*3
    • review pull requests
  • Week W41 (10/06~10/10):
    • Bug solving for mtbf
    • test cases experiments
    • combo runner
    • db for phone and data
Cynthia
  • Week W40 (09/29~10/03):
    • Take care of Flame KK v2.0 automation reports
      • Bug 1077377 - [v2.0] Investigate test_camera_flash_modes failure
      • Bug 1077367 - [v2.0] Investigate test_camera_capture_video failure
    • Clarify and reproduce Woodduck issues
  • Week W41 (10/06~10/10):
    • Take care of Flame KK v2.0 automation reports
    • Clarify and reproduce Woodduck issues
Edward
  • Week W40 (09/29~10/03):
    • Smoketest for v2.1 productivity apps with KK build
    • B2g perf for productivity of v2.1
    • Rewrite test cases of WebRTC and RTSP
    • [Media Platform] Test cases modification - getUserMedia
    • [Prod] Test/ verify sprint 5 tickets
    • 2.1 Feature sharing
  • Week W41 (10/06~10/10):
    • [Prod] Test/ verify sprint 6 tickets
    • Smoketest for v2.1 productivity 3rd run
Shing
  • Week W40 (09/29~10/03)
    • Cost Control test cases design.
    • Read Pragmatic Software Testing.
    • Prepare sharing on how to submit app to Firefox Marketplace.
    • Cost control 2.1 blockers triage with Marshall (RD).
  • Week W41 (10/6~10/9)
    • Cost Control test cases cleanup.
    • Apps usage metrics test cases design.
    • Read Pragmatic Software Testing
    • Sharing on how to submit app to Firefox Marketplace
Askeing
  • Week W40 (09/29~10/03)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.
  • Week W41 (10/6~10/9)
    • Investigate the MCTS.
    • Develop the flashing tools for MTBF.
    • Prepare the information of outsourcing.
    • Follow up the Card UI user story.
Gerry
  • Week W40 (09/29~10/03)
    • Smoketest for v2.1 system platform with KK build.
    • App usage metric test cases design.
    • 2.1 system platform feature sharing.
    • Verify 2.1 bugs.
  • Week W41 (10/6~10/9)
    • Smoketest for v2.1 system platform with KK build.
    • Finish app usage metric test cases.
    • Verify bugs.
Mike
  • Week W40 (09/29~10/03):
    • Flame base image verification: v184
    • Madai bug verification
    • Extend Orangutan capability
    • 3rd party app performance measurement
  • Week W41 (10/6~10/9)
    • 3rd party app performance measurement
    • Madai bug verification
    • Device Team Entry Criteria discussion
    • Arrange discussion of topics against MozTrap Ecosystem
Paul
  • Setup device for flame_kk
  • Workaround for v2.0 software home button
  • Fix test case error
  • Patch for reusing marionette instance
  • Trigger custom build run for patch 1064800
  • Trigger test run
  • Fix device test issue for mtbf on tako
  • day off - 10/8 - 10/9 in Okinawa

-- backlog --

  • Followup live test run stream
  • Datazilla integration
  • Bug fix for in-testcase logging
  • Modify crash report patch based on review
eric
  • Week W40 (09/29~10/03):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Reviewing smoke test case
  • Week W41 (10/06~10/09):
    • Exploratoy against v2.1
    • Feature page index for OS
    • Verification of bugs before FC
    • Fixing SMS/STK test cases
    • Reviewing smoke test case
    • Market customization testing
Hubert
  • Week W40 (09/29~10/03):
    • Woodduck weekly meeting
    • Follow up Woodduck tasks and issues
    • Plan outsourcing training items (Document, account...etc)
    • Woodduck triage meeting
    • Outsourcing meeting with EPM
  • Week W41 (10/06~10/09):
    • Woodduck weekly meeting
    • Follow up Woodduck tasks and issues
    • Plan outsourcing training items (Document, account...etc)
    • Woodduck triage meeting
    • Outsourcing meeting with EPM
William Hsu
  • Week W40 (09/29~10/03)
    • [Device] Assist device related tests - Tako
      • Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30)
      • Assign Tako's bugs to developers and stakeholders.
      • Weekly meeting with partner (9/30)
        1. Three-way synchronization (project status)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • Others,
      • Q3 personal performance review
  • Week W41 (10/06~10/10)
    • [Device] Assist device related tests - Tako
      • Assign Tako's bugs to developers and stakeholders.
      • Executing Gaia UI test on Tako ES2 build (ETA: 10/07)
      • Executing smoketest on Tako ES2 build (ETA: 10/09)
      • Weekly meeting with partner (10/07)
    • [Device] Assist device related tests - Flame
      1. Gaia UI test on v2.0 Build
      2. v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
    • Others,
      • National holiday 10/10
Alison
  • Week W40 (09/29~10/03):
    • Reviewing smoke test case
    • Bugs verification
  • Week W41 (10/06~10/09):
    • Smoketest for bluetooth v2.1
    • Bugs verification