Firefox OS/DeviceQA/2014-10-27WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W44 (10/27~10/31):
    • Mozilla Certificate Test Suite
      • Finish MCTS testing on v2.0
      • Start to track bug list and check the status
    • Africacom support
      • Testing on real devices (Open C by @Cynthia)
    • Support Privacy Panel feature test review
    • Mozilla Certificate Test Suite
    • Remove unnecessary test environment from moztrap
    • new comer training
Alison
  • Week W44 (10/27~10/31):
    • Bugs verification
    • Bug bash - bug evaluation & filing
    • Test cases categorization for Peripherals
  • Week W45 (11/3~11/7):
    • Bugs verification
    • Go through NFC secure element API (2.2 feature) test spec with DT developer
    • Try run marionette test for real device
Askeing
  • Week W44 (10/27~10/31):
    • Resolve the issues of outsourcing.
    • Follow up the Card UI tasks and issues.
    • Connected Devices meeting.
    • Multithreading the tk GUI.
    • Hide the console cursor.
  • Week W45 (11/3~11/7):
    • Connected Devices meeting.
    • Follow up the issues of Connected Devices.
    • Develop cross-platform tools by Python.
Cynthia
  • Week W44 (10/27~10/31):
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Test/verify bugs for woodduck.
    • Marionette JS automation script for Settings-24 hour time format
    • Create the test case
      • Bug 0912002 - Support forwarding attachments
      • Bug 1023658 - Hide CC and BCC fields while composing an email
  • Week W45 (11/3~11/7):
    • Marionette JS automation script for Email-Signature
      • In setting, default signature is "Sent Using Firefox OS"
      • In account setting, edit signature
      • Set signature in new account page
      • Original signature cannot be changed when user modified signature in mail body
    • Africacom support: Assist Al in testing on Open C
    • Take care of Flame KK v2.0 automation reports (Daily)
    • Executing Gaia UI test on Woodduck and update reports on wiki (Daily)
    • Test/verify bugs for woodduck
Edward
  • Week W44 (10/27~10/31):
    • Bug bash follow-up
    • Identify bugzilla flag in every stage
    • Marionette JS
      • Find out what user story of v2.1 can be automated .
      • Create v2.1 automation script
  • Week W45 (11/3~11/7):
    • Verify sprint 7 and 8 tickets of productivity
    • Create test cases (user flow) for power consumption.
    • QAwanted bug verification and figure out issue.
Eric
  • Week W44 (10/27~10/31):
    • Bug bash - bug evaluation & filing
    • Market customization testing
    • Feature testing page
  • Week W45 (11/3~11/7):
    • API testing checking
    • Market customization testing
    • Bugs testing with local patch
Gerry
  • Week W44 (10/27~10/31):
    • Bug bash - bug evaluation & filing
    • Test cases categorization for "System Platform"
    • Follow up and verify bugs.
  • Week W45 (11/3~11/7):
    • Finish test cases categorization for "System Platform"
    • Follow up and verify bugs reported by QAnalyst.
Hubert
  • Week W44 (10/27~10/31):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
  • Week W45 (11/03~11/07):
    • Follow up Woodduck tasks and issues
    • Handle outsource tasks
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Generate power consumption test cases
    • Survey power consumption test
Mike
  • Week W44 (10/27~10/31):
    • Bug bash follow-up work
    • Bug reproduction
    • Power consumption investigation
    • Flame FOTA verification
  • Week W45 (11/3~11/7):
    • Flame FOTA verificaton
    • Discuss power consumption benchmark
Paul
  • Bug reproduction
  • Partner support
  • Modify lab script by python
  • Merge debug setting tools

-- backlog --

  • Evaluating test solution on mac mini
  • Followup live test run stream
  • Datazilla integration
  • Modifying crash report patch based on review
  • Chaos Monkey for b2g (random process killer)
  • Memory stress test
Shing
  • Week W43 (10/27~10/31):
    • Supported Bug Bash.
    • Verified cost control bugs.
    • Practiced Marionette JS automation.
    • Studied performance tuning for MozTrap.
  • Week W44 (11/3~11/7):
    • Verify Bugs.
    • Cost control automation.
    • MozTrap Performance .
    • Practice App with persistence.
    • Backlog:
      • Improve MozTrap helper addon.
Teri
  • Week W43 (10/27~10/31):
    • Help verify Bug Bash results.
    • Study how to write/run FxOS app.
    • Study Gaia UI test.
    • Verify Marigold test reports.
  • Week W44 (11/3~11/7):
    • Verify Marigold test reports.
    • Learn to write/run FxOS app.
    • Learn about productivity apps.
Walter
  • Week W43 (10/27~10/31):
    • Taking care of Bugs
      • Bug 1074063 - [MTBF][B2G] white & black screen
        • Verified
      • Bug 1076605 - [MTBF][App Launch] Apps can't be launch
        • Not reproducible
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1084179 - [MTBF][B2G][Stability][Camera] Camera App will be black with button visible
        • Not reproducible
    • Restruct
      • Simplify flow and lots of discussion
    • Presentation of MTBF and its knowledge
  • Week W45 (11/3~11/7):
    • Taking care of Bugs
      • Bug 1077292 - [MTBF][B2G] Phone shutdown due to high power consumption and chopped charging
      • Bug 1092924 - [MTBF][B2G] B2G crashed due to oom or other related issues.
    • Restruct
William Hsu
  • Week W44 (10/27~10/31)
    • [Routine] 24 bug from the time of the writing of this (Ref: http://goo.gl/LDmSXl)
    • [Device] Assist Tako related stuffs
      1. Assign Tako's bugs to developers and stakeholders.
      2. Executing Gaia UI test on Tako v2.0 build (ETA: 10/28)
      3. Weekly meeting with partner (10/28)
      4. Tako v2.1 Test Plan (Ref: http://goo.gl/Zt65tp )
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      • Gaia UI test - Address camera failed tests
        1. test_camera_capture_video.py
        2. test_camera_multiple_shots.py
        3. test_lockscreen_unlock_to_camera_with_passcode.py
        4. test_dialer_airplane_mode.py
  • Week W45 (11/03~11/07)
    • [Device] Assist Tako related stuffs
      1. Assign Tako's bugs to developers and stakeholders.
      2. Weekly meeting with partner (11/04, TBC)
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn)
      • Address camera failed tests
        1. test_sms_with_attachments.py
        2. test_camera_flash_modes.py
    • Others,
      • Health examination: Nov. 3rd (Morning).
      • Personal leave: 11/06~11/10.