FirefoxOS/DeviceQA/2015-03-09WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W11 (03/09~03/13)
    • MCTS v2.2
      • Solving MCTS v2.2 blockers
    • Discuss about Security tests in MCTS
      • support Christian pick it up
    • Bug 1137065 - [MCTS][2.2] Identify new IDL and writing test cases
    • Support Fire2-3.5 MCTS
  • Week W12 (03/16~03/20)
    • MCTS v2.2
    • Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
      • attempting to resolve it again \_/#
    • Have a release for MCTS v2.2 in this week
    • Marionette Issue
    • Support Fire2-3.5 MCTS
Alison
  • Week W11 (03/09~03/13)
    • Bugs verify
    • Monitor Nexus-5-L MTBF testing
    • NFC regression test - Nexus5-L
    • Prepare NFC workweek QA session
    • flame-kk v2.2 PTS - HFP
  • Week W12 (03/16~03/20)
    • Bugs verify
    • Monitor Nexus-5-L MTBF testing
    • NFC workweek remote sessions
Askeing
  • Week W11 (03/09~03/13)
    • Assist Edward for Bug 1132515.
    • MCTS issues fixing.
    • Bug 1135094 - "make test" fails with "No module named semiauto"
    • Bug 1142409 - [MCTS] add v2.2 to supported versions
    • Bug 1142421 - marionette-extension should support v2.2
    • Bug 1142422 - fxosapp-gen should support v2.2 officially
    • Bug 1142430 - [MCTS] The semiauto tests will show "Could not close CertTest App automatically..." error message.
  • Week W12 (03/16~03/20)
    • MCTS issues fixing.
    • Bug 1142421 - marionette-extension should support v2.2
    • Bug 1142422 - fxosapp-gen should support v2.2 officially
    • Bug 1143531 - [MCTS] update the dependencies to support v2.2
    • Bug 1144605 - NameError: global name 'dm' is not defined
    • Bug 1142430 - [MCTS] The semiauto tests will show "Could not close CertTest App automatically..." error message.
    • Bug 1144536 - [MCTS] Change omni.ja test with a proper presentation in report
Cynthia
  • Week W11 (03/09~03/13)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Assist Edward in identifying Bug 1132515
      • Understand build processes and roles
      • Prepare script for cloning Geckos during 1/26
      • Prepare build scripts for each Gecko (#100)
      • Rebuild Gecko system images (#100)
      • Flash system images in devices (#100)
      • Run performance testing for devices (#100)
      • Collect analysis result
  • Week W12 (03/16~03/20)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Take care of Flame KK v2.2 automation reports (Daily)
    • Assist Edward in identifying Bug 1132515
      • Understand build processes and roles
      • Prepare script for cloning Geckos during 1/26
      • Prepare build scripts for each Gecko (#100)
      • Rebuild Gecko system images (#100)
      • Flash system images in devices (#100)
      • Run performance testing for devices (#100)
      • Collect analysis result
Edward
  • Week W11 (03/09~03/13)
  • Week W12 (03/16~03/20)
Eric
  • Week W11 (03/09~03/13)
    • Bluetooth PTS on Flame-KK
    • Check for v2.2 bug status
  • Week W12 (03/16~03/20)
    • Check for v2.2 bug status
Gerry
  • Week W11 (03/09~03/13)
    • v2.2 feature testing
    • QAnalyst/MGSEI bugs verification/follow-up
    • Nexus 5 automation test monitoring
    • Privacy controls debug build env setup - done
    • Test Spect template drafting
  • Week W12 (03/16~03/20)
    • v2.2 feature testing
      • Privacy Controls feature - keep testing.
      • Follow up unresolved issues.
    • QAnalyst/MGSEI bugs verification/follow-up
    • Nexus 5 automation test monitoring
    • Test Spect template drafting
Hermes
  • Week W11 (03/09~03/13)
    • Monitor v2.2+ System FE Bugs
    • Let progress of Stagnant Bugs from QAnalyst moving
    • Study some b2g materials
  • Week W12 (03/16~03/20)
    • Monitor v2.2+ System FE Bugs
      • Feature landing verification of Bug 1001861 if all features are landed.
    • Start MozTrap enhancement
      • Study react.js
      • take some cards and implement them
Hubert
  • Week W11 (03/09~03/13)
    • Follow up Woodduck tasks and issues
    • Outsourcing weekly meeting
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA (Completed: 65%)
    • In-House FOTA testing strategy discussion with PM and RD.
    • Generate lesson learn document for woodduck project. (Completed: 60%)
  • Week W12 (03/16~03/20)
    • Follow up Woodduck tasks and issues
    • Outsourcing weekly meeting
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA
    • In-House FOTA testing strategy discussion with PM and RD.
    • Generate lesson learn document for woodduck project.
    • Study OTA data migration automation test
Mike
  • Week W11 (03/09~03/13)
    • v2.1 bug work
    • Support power tool setup
    • Automation fail case investigation
  • Week W12 (03/16~03/20)
    • v2.1 bug work
    • Power consumption measurement
    • Support Madai issue verification
    • New SUPL server follow up
Owen Ouyang
  • Week W11 (03/09~03/13)
    • MCTS 2.2
      • Bug 1142881 - [MCTS][2.2] Enhance Report to generate single html
      • bug 1142442, uninstall marionette and backup.restore should only call once
    • Stingray, report check and verify
  • Week W12 (03/16~03/20)
    • MCTS 2.2
      • Study get device information and store for later testing config
      • Orietation image discuss
Paul
  • Week W11 (03/09~03/13)
  • Investigating v2.2 mtbf run
  • Week W12 (03/16~03/20)
    • add function for mtbf-driver makefile
    • Review and fix patches for test harness
    • Bug work for mtbf on flame-kk and nexus5-L
      • Bug 1141418 - After 9 hours running, marionette server response incorrectly
      • Bug 1141962 - [MTBF][Nexus5-L] MTBF testing aborted and found lots of "E MP-Decision: Error 1 setting online status to 1 forcpuX" error in logcat
      • Bug 1142384 - [MTBF] System crashed, wifi keep spinning

-- backlog -- Chaos Monkey for b2g (random process killer) Create daemon to emit locking status Modifying crash report patch based on review (pending to b2gDevice in mozbase) Followup live test run stream Datazilla integration Memory stress test

Shing
  • Week W11 (03/09~03/13)
    • New test case management system design brainstorming
    • Metrics testing
    • Metrics test case design
    • Bluetooth PTS testing
  • Week W12 (03/16~03/20)
    • New test case management system prototyping
    • Bluetooth PTS testing
    • Metrics testing
    • MozTrap enhancements
      • Meetings with US team + qanalyist
      • Meetings with Johan
Teri
  • Week W11 (03/09~03/13)
    • V2.2 Cgroup
      • 4 tests done, 2 in progress
    • V2.2 Bluedroid
      • PTS - environment setup
      • Automation Report
    • Reconfig Jenkins environment settings
    • V2.2 email attachment
      • Verified on master
      • Verify on v2.2
  • Week W12 (03/16~03/20)
    • V2.2 Cgroup
      • [Done] Finished testing
      • MTBF run into an issue of black screen with empty log data
      • Bug 1082290 - Implement cgroup swappiness feature for low memory target (256 MB)
    • V2.2 Bluedroid
      • Eric, Alison, Shing helped completed PTS testing
    • V2.2 email attachment
      • [Done] Verified on v2.2
    • BT APIv2
      • [Done] Sanity testing: Bug 1130946 - [meta] [Bluetooth2] Bug fixing for 1st round test of Bluetooth APIv2
      • Opened bug: Bug 1144532 - [Bluetooth2] Visible to all should turn off after 2 mins
Walter
  • Week W11 (03/09~03/13)
    • Lab works
      • Help with Cynthia, Edward, and so on
    • MTBF operation and MTBF driver modification
    • MTBF Bugs
  • Week W12 (03/16~03/20)
    • MTBF Triggering / Report
    • MTBF operation and MTBF driver modification
    • MTBF Bugs
William Hsu
  • Week W11 (03/09~03/13)
    • [Device]
      • Bug work
      • GU test on Flame v2.0 & Flame v2.1 & Dolphin v2.1s
    • [Outsourcing]
      • Investigate automation fail cases
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
      • Set up automation test environment for Dolphin v2.1s (512MB)
      • Set up test-perf for Flame v2.2 and Nexus-5
      • Team Building 3/09 and PTO on 3/13
  • Week W12 (03/16~03/20)
    • [Device]
      • Bug work
      • GU test on Flame v2.0 & Flame v2.1 & Dolphin v2.1s
    • [Outsourcing]
      • RTL test case review
      • Dispatch bugs of free test
      • Q1 performance review and documentations