FirefoxOS/DeviceQA/2015-09-28WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Alison
  • Week W39 (09/21~09/25)
    • [v2.5 Pin the Web] Update test plan and test cases based on the latast UX spec
    • [v2.5 Pin the Web] Exploratory test
    • Bugs work from QAnalyst/Marigold
  • Week W40 (09/28~10/02)
    • [v2.5 Tracking Protection] Confirm 2.5 scope
    • [v2.5 Tracking Protection] Study feature and write test plan
    • [v2.5 Tracking Protection] Create test cases
    • Bugs work from QAnalyst/Marigold
Askeing
  • Week W39 (09/21~09/25)
    • Prepare Slides of Academy Program
    • Investigate the biwet issue
    • Develop the prototype of TC DL
  • Week W40 (09/28~10/02)
    • Academy program preparation
    • Investigate the biwet issue
Cynthia
  • Week W39 (09/21~09/25)
    • [v2.5 TV - TV Deck] Design test cases and execute the testing
    • [v2.5 TV - EPG] Design test cases and execute the testing
    • [v2.5 TV] Bugs work
  • Week W40 (09/28~10/02)
    • [v2.5 TV - Pocket Integration] Study feature and create test cases
    • [v2.5 TV - Bookmark Sync] Study feature in desktop for preparing the test account
    • [v2.5 TV] Bugs work
Gerry
  • Week W39 (09/21~09/25)
  • Week W40 (09/28~10/02)
Iris
  • Week W39 (09/21~09/25)
    • Set up testing environment on Desktop
    • Practice automation testing b2g
    • Study ftu-ping, app usage testing
  • Week W40 (09/28~10/02)
    • Set up Telemetry server/device/environment
    • Study Telemetry testing
Kinder
  • Week W39 (09/21~09/25)
    • [New Tool Development]
      • Prepare Puppet Scripts demo
  • Week W40 (09/28~10/02)
    • [New Tool Development]
      • Survey Docker
Mike
  • Week W39 (09/21~09/25)
    • [Open Mobile]
      • P1 issues verification
    • [v2.5]
      • Monitor performance regression
      • Add more add-ons test cases
      • Study New Security Model
  • Week W40 (09/28~10/02)
    • NSec WW
Paul
  • Week W39 (09/21~09/25)
    • integrating crash-bug-report system
  • Week W40 (09/28~10/02)
    • support replaceable homescreen
Shako Ho
  • Week W39 (09/21~09/25)
    • MTBF
      • integrate the raptor Minion with boss framework [in progress]
      • Fix MTBF test cases on aries [done]
  • Week W40 (09/28~10/02)
    • MTBF
      • integrate the raptor Minion with boss framework [in progress]
      • Fix MTBF test cases on aries [done]
Shing
  • Week W39 (09/21~09/25)
    • RedSquare workshop at Mountain View
  • Week W40 (09/28~10/02)
    • (PTO for 2 days)
    • RedSuqare QA SOW
    • QA Test addons
    • Academy program preparation
Teri
  • Week W39 (09/21~09/25)
    • [V2.5] Replaceable Homescreen
      • New home screen
        • Additional memory tests as suggested by Dev feeback
        • Provided test results and analysis to Dev for comment and review
        • Positive feedback from Dev about test results - no regression
      • Replaceable homescreen
        • Sent out test cases and test plan for review
    • [V2.5 PTS]
      • Review Marigold PTS test result
      • Resolved task cluster specific build reference issue
      • Resolved PTS 6.2.1 profile inconsistency problem
      • Confirm test case details with MariGold
      • 2 blocked bugs: 1208310, 1208337
  • Week W40 (09/28~10/02)
    • [V2.5] Replaceable Homescreen
      • Part 2 replaceable homescreen code landed
      • Start testing
    • [V2.5 PTS]
      • Follow up blocked bugs
      • Resolved workspace profile inconsistency issue
Walter
  • Week W39 (09/21~09/25)
    • PR reviews
    • MCTS Cert-WebAPI fixes
    • Planning for better ways of MCTS Cert reference generation
  • Week W40 (09/28~10/02)
    • holidays on 9/28 & 9/29
    • matching issues in bugzilla, scrumdesk, github, and google doc
    • PR reviews
    • Better ways of MCTS Cert reference generation
    • Checking for MCTS results again since all suites are fixed
William Hsu