Name
|
Done
|
Plan
|
Alison
|
|
|
Askeing
|
- Week W46 (11/09~11/13)
- Investigate Vagrant
- Investigate apply patches and scripts for ITP
- Develop credentials error handler of TC tools
- Develop B2G flash tools
|
- Week W47 (11/16~11/20)
- Implement flashtool menu program of ITP
- Write ITP slides
- Develop credentials error handler of TC tools
|
Cynthia
|
|
|
Gerry
|
|
- Week W47 (11/16~11/20)
- Track 2.5 bugs/status
- Clarify 2.6 feature scopes
- Prepare EuroStar sharing
|
Iris
|
- Week W46 (11/09~11/13)
- [Telemetry]
- Verify Bugs, Bug list: https://goo.gl/scA35s, no blocker
- Create test cases on Moztrap - done
- App Usage Regression - done
|
- Week W47 (11/16~11/20)
- [Telemetry]
- Track and verify 2.5 Bugs
- Telemetry regression
|
Kinder
|
|
|
Mike
|
- Week W46 (11/09~11/13)
- EuroSTAR training summarise
- Open Mobile sync up
- Monitor performance regression
- NSec test case creation
- Verify NSec issues
|
- Week W47 (11/16~11/20)
- EuroSTAR sharing slides creation
- Open Mobile sync up
- Monitor performance regression
- Verify NSec issues
|
Paul
|
|
|
Shako Ho
|
|
- Week W47 (11/16~11/20)
- MTBF daily operation
- fix the email with with network domain name added
- review gaia header fix patch
- MCTS daily operation
- review new decency package patch
|
Shing
|
|
|
Teri
|
- Week W46 (11/09~11/13)
- [V2.5] PTS
- Discussed with Dev about investigation results
- All issues are resolved: PTS 6.3.0 bug or configuration issues
- Updated PTS wiki with new PTS 6.3.0 setup section
- PTS v2.5 RA meta bug - asked Marigold to run another full run
- [V2.5] Replaceable Homescreen
|
- Week W47 (11/16~11/20)
- [V2.5] PTS
- [V2.5] Replaceable Homescreen
- Modify moztrap test cases to reflect latest design change
- Run tests for new edit mode change
- [V2.6]
- Study Pin the web and Control Center
|
Walter
|
- Week W46 (11/09~11/13)
- Ran v2.5 MCTS
- EuroSTAR presentation discussion
- Compensated Leave on monday
|
- Week W47 (11/16~11/20)
- Ran v2.5 MCTS for an overview
- generate golden image
- solve webapi test related issues
- MCTS report
|
William Hsu
|
- Week W46 (11/09~11/13)
- v2.5 user story
- RTL test progress follow-up and bug triage
- L10n test progress follow-up
- Configure 2.5 Gaia UI test Jobs by following bitbar settings
- Jenkins maintenance (Making sure all high priority jobs are stable)
- [Outsourcing]
- 2015 Q4 task discussion
- Marigold weekly report (https://goo.gl/XIQ2fy)
- v2.5 task assignment
- Tracing Marigold working model and process
|
- Week W47 (11/16~11/20)
- v2.5 user story
- RTL test progress follow-up and bug triage
- L10n test task assignment
- Configure 2.5 Gaia UI test Jobs by following bitbar settings
- [Outsourcing]
- 2015 Q4 task discussion
- Marigold weekly report (https://goo.gl/XIQ2fy)
- v2.5 task assignment
- Tracing Marigold working model and process
|