L10n:Planning/2012-03-05
From MozillaWiki
Meeting Details
- Time and location: Monday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
- Contract with Dwayne
- goals
- l20n with b2g/jetpack. see also the feature list
Action Items
carry-overs
Roundtable
arky
goal for this week:
planned for this week:
done last week:
chofmann
goal for this week:
planned for this week:
done last week:
gandalf
goal for this week:
Update the python parser to work with new features
planned for this week:
- Work on new features with Pike and Stas
- Update the grammar and python parser to work with the new features
done last week:
- finalize the list of new features for L20n
- update pyast to support tree dumping
- initialize work on the toolchain for l20n
- work with fantasai on LOL syntax improvements
Jeff
goal for this week:
planned for this week:
- Blog post on fixing small L10n bugs (see l10n blog post schedule).
- Draft intermediate Narro tutorial.
- Make edits to process documentation on wikimo.
- Finish tools vision testing analysis.
- Q2 goals
done last week:
- Finished translator recruiting for MozCamp LATAM.
- Began intermediate and advanced Narro tutorials.
- Prepared presentation for next week's career fair.
- Spent most of last week sick with flu.
Matjaž
goal for this week:
planned for this week:
done last week:
Milos
goal for this week: Get progress in LSV updating Educate Ibrahima(ff) on HG
planned for this week:
- LSV updating
- Affiliates new process implementation
- Flicks update and reaching-out
- Blogging
- Old-beta style locales: figure out trending since Firefox 4
done last week:
- Productization
- Firefox Flicks Release(yay!)
- Affiliates l10n process rewrite
Status on beta:
- Acholi: San James is not responding in bugs, but deferring to Dwayne
- Burmese: no response since landing
- Ligurian looks good for de-beta, Axel to double-check and review sign-off
- Fulah: Had problems finding a right time to catch up with Ibrahima
- Wolof: No response
Pascal
goal for this week:
planned for this week:
- Prepare the excel file for EUBallot with the translated strings
done last week:
- put a beta download link on all /new pages with an existing beta promotion string (convinced engagement to reuse a string and activate the link for all locales instead of translating a new one for 4 locales only). Fixed about 20 pages to still look good after that visual change.
- gave instructions for SVN to Arash our Persian localizer (I was committing for him until he got his account created)
- Launched translation of a new snippet to promote Firefox Flicks on about:home
- Created ESR pages for German
- Coded a live view of snippets.lang so as that marketing can easily check locales done and copy/paste them http://l10n.mozilla-community.org/~pascalc/langchecker/?action=translate
- Worked with Alexis from the python services team to help me setup bedrock locally (he even patched bedrock to fix the install steps which lacked documentation)
- Kept working on Beta pages, 47 locales done
Pike
planned for this week:
- mercurial 2.1 support for the dashboard
- help elmo ship
- prepare for merge day
done last week:
- loads of reviews following up to outreach
- investigated outdated ldap accounts. Too many
stas
goal for this week:
planned for this week:
done last week: