L10n:Planning/2012-07-02
From MozillaWiki
Meeting Details
- Time and location: Monday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
Action Items
carry-overs
Roundtable
arky
goal for this week:
planned for this week:
done last week:
chofmann
goal for this week:
planned for this week:
done last week:
gandalf
goal for this week:
planned for this week:
done last week:
- structuring the code for LOL structure updates
- proper diff method for LOLs including multi-LOL diff
Jeff
goal for this week:
planned for this week:
- Follow up on community outreach.
- Create slide decks for ReMo to use with l10n recruiting.
- Using Elmo dashboards wiki tutorial.
- Discuss with PT and ES teams about recruitment plans via Get Involved page.
- Publish survey blog post.
- Follow up with GSoC project.
- Plan for / Creation of Mozilla L10n twitter feed.
done last week:
- Contribute sprint with Arky
- Drafted survey blog post.
- Community outreach with Arabic and Tamil teams.
- Blog post/letter of intent for Nacnati and endangered languages.
- Played around with Axel's outreach utility.
Matjaž
goal for this week:
planned for this week:
done last week:
Milos
goal for this week:
- LSV Major update
planned for this week:
- LSV updates
- Contribute page bedrock check-up
- Follow up to all p12n bugs
done last week:
- Firefox Flicks merge/update
- Made Contribute pages on mozilla.org(BEDROCK) localizable and planned l10n with Pascal and Giorgos
- Personal goals etherpad updated
- Google Play banners l10n
- Facebook ads
- Some p12n bugs reviewing
Pascal
goal for this week:
planned for this week:
- Finish and publish contribute page in pt-BR
- bug triaging of old mozilla.org bugs
- Finish partners page, one video left
done last week:
- kk updates with new localizer
- many small updates, most of them around snippets
- some bedrock work with Rik who merged my pending pull requests
Pike
planned for this week:
done last week:
- Massive outreach around Firefox 14/15
- also loads of sign-off reviews
- Outreach app mostly works
- Dependencies:
- patch emailjs (unicode names in headers, needs work, https://github.com/eleith/emailjs/issues/33)
- patch exhibit ('filter' control broken, needs tests, do I really need this?)
- patch elmo (better outreach data bug 768488, needs self-review, possibly tests)
- discuss localizing the metro UI for Firefox with robstrong and Jim Mathies (bug 769677)
stas
goal for this week: follow up after the b2g work week
planned for this week:
- blog post about the b2g workweek
- blog post about l20n's dom overlays
- figure out the git to hg migration of gaia-l10n
done last week:
- barcelona b2g work week
- process:
- agreed on a string freeze on July 20th
- adding locales should be possible in regular updates every 18 weeks
- infra
- filed bug 766962 for getting l10n builds
- filed bug 768851 for elmo integration
- filed bug 768373 for gaia-l10n migration to hg
- platform
- agreed on the final file format
- discussed lang negotiation
- still need to figure out how we're doing the fallback to en-US
- filed bug 768939 about making sure that error messages will be displayed localized
- see also the discussion in m.d.b2g (I don't know how to link to it here, but search for "How to display localized messages coming from Gecko")