L10n:Planning/2013-05-27
From MozillaWiki
Meeting Details
- Time and location: Monday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
Action Items
carry-overs
Roundtable
arky
planned for this week:
done last week:
chofmann
planned for this week:
done last week:
flod
planned for this week
- Get involved page on mozilla.org. In general waiting for a reply (jbertsh, dbowsell, tshahian) to understand how long is the 15 years template going to stay online, and if we need custom graphics (Lee Too).
- bg: still missing mail templates (Bug 873281)
- hr: already in production with old template, problems with auto-replies (Bug 760823)
- ru: some css problems with the template (Bug 859537)
- sl: strings are ready (Bug 830298). Waiting for sr pull to land on GitHub to understand if that's all is necessary to enable the template.
- sr: enabled on production but waiting for new template (Bug 796066)
- ta: waiting for updates about contact info (Bug 796062)
- Work with Pascal: string extraction, updates to mozilla.org (github/bedrock), adding .lang files to the dashboard, how to deal with es-* redirects on mozilla.org
- Plugincheck not updating on dev/production (tomcat/espressive, sent mail). Need to check again this week with Pascal (Tomcat on PTO).
- FHR: pending l10n bug Bug 857948 - Hardcoded month names, Bug 867973 - fallback mechanism for locales not shipping.
done last week:
- Teaser page still containing en-US strings. Strings extracted, should be fixed but waiting for localizer to complete their files and check the demo server.
- Localized Mozilla Manifesto.
- 15 years of Mozilla: fixed missing string for pt-BT, id, zh-CN.
- Improve devtools comments and strings (Bug 874785).
- Stage/production updates.
gandalf
planned for this week:
done last week:
Jeff
planned for this week:
done last week:
Matjaž
planned for this week:
done last week:
Milos
planned for this week:
done last week:
Pascal
planned for this week:
done last week:
Pei
planned for this week:
done last week:
Pike
planned for this week:
done last week:
- workweek with stas
- todo/workflow app design review
- sign-off reviews
- code reviews
- gather mozillians.org data for the summit, and mash it up
- there are some loose ends for localizer invites and locale coverage in summit attendees
- met with jezdez, talked about
- elmo
- django i18n
- stuff
- evaluated dropping buildbot for elmo alltogether
- looked a good deal into celery. Doesn't seem to be a perfect match, as it's running many slaves on a single machine, and we could share the working directory much. but that level of sharing isn't exposed in celery.
- next up: dive into http://wiki.python.org/moin/ParallelProcessing to check for alternatives.
- triggered some discussion on l10n and agile on the twittersphere, https://twitter.com/axelhecht/status/337252404246478849, https://twitter.com/textexin/status/337796685684162560, http://www.i18nguy.com/l10n/Agile-Localization-Practices.pdf
stas
planned for this week:
done last week: