Mobile/ProductPlanning/Notes-2013-10-29
From MozillaWiki
< Mobile | ProductPlanning
Hot items
- Fx 25
- Hopefully none :)
- QA signed off on RC https://wiki.mozilla.org/QA/Fennec/25/RC/build3
- Release notes: https://www.mozilla.org/en-US/mobile/25.0/releasenotes/
- Erin checking why the contacts API made it into the release notes <== this looks like it was human error, akeybl fixed.
- Fx 26
- On track with re-design of about:home?
- bug 918007 - Disable toolbar elements (menu, back, forward, tabs) while in editing mode on tablets
- addition of bing & yahoo
- blassey has put in a request to uplift bug 923795 - Add condition to MozParam to detect top 2 (or N) position
- FR on track for 26
- DE, ES an GB are at risk for 26
- To be clear: the number 1 default position will not change from Google. Changing the default 1 position will come later, TBC with the l10n teams
- On track with re-design of about:home?
- Fx 27
- Marketplace UI polish/clean-up: in 27
- Shumway target
- Need to enumerate what has to happen for Android-specific support: bug 905668 - [Meta] Shumway for Firefox for Android
- 27 and 28 too early to target
- Brad to list out the work for Erin
- Need product to triage, for fennec China in order to understand what level of integration we need for m-c: https://mobile.etherpad.mozilla.org/25
Prototype
- Marrying second screen (living room TV) & WebRTC & casting use case for early demo / proto
Product Feature Funnel
- Work is ongoing
- Trying to figure out what to do with the list now that we have it
- Will be going through P1 items with Ian on Thursday to sort out which we'll likely want to do prototype testing on with user research
- Will be scheduling a meeting for the team sometime in the next week or so to do "relative effort" estimations for both UX and Engineering for each of the P1 items - I just have to get some rough information into the project pages first
- Then just fleshing out more project pages & breaking the P2 & P3 items down into subfeatures so we can continue the process on those
Roadmap
- Once rough estimates are provided, features will be added as proposed targets up to Fx 31
Q4 Goals
- Add Bing and Yahoo search to selected locales (FF27) and measure impact via FHR
- Validate 2 major distribution opportunities [1]
- Deliver updated roadmap and feature targets through FF31
Roundtable
- Partner updates
- Marketing update? (Putting Jesse on the spot)
- Brazil and Indonesia has seen strong spikes in ADIs
- Re-design walk-through Fx 27
- Lucas and Ian to come up with a list for us to look at on both smartphone & tablet
- Favicon rewrite Fx 27
- Ensure everything works smoothly
- Yahoo! & Bing additions
- Ensure all new (and current) profiles work as expected with the additional search engines
- Followup on l10n after mobile workweek
- reflow to zoom - under dbaron's remit now that scott has left