Mobile/ProductPlanning/Notes-2015-09-08

From MozillaWiki
Jump to: navigation, search

Hot items

Everyone

  • [BB] On-going tracking protection check-in: Boston work days October 6-7
  • [BB] On-going Project Kinderfox check-in

Roadmap & Funnel update

Jenn/Maria/Barbara/Karen

Android Happenings

iOS Happenings

  • Aha updated to include high-level feature descriptions of what's in v1.0
    • v1.0 has now officially 'shipped' so hidden from the typical Aha view - look in the Release view if you want to look at the v1.0 features
  • iOS v1.0 launched in NZ Sept 3 and we're getting both reviews (a handful) and a fair bit of feedback into input.mozilla.com
  • v1.1 'must have' features have been broken down. Looking for time in the next day or so to do a quick sizing run. Tracking sheet is HERE

Partner review

In-meeting updates
Status can be found on Mana

Search

Kev

Feedback

Rob

Android

  • Android feedback looks stable, no feedback roll-up this week

iOS

  • iOS feedback is quite positive
  • Working on qualitative roll-up of feature requests / potential bugs in DScout highs/lows

Marketing

Mike

Roundtable

Everyone

  • KR is starting some MWC planning / prep (which is why I'm not at this meeting today!)

References

Android Notable Links

iOS Notable Links

Goals

Q3 Goals