QA/Fennec/11/Beta
Contents
Fennec 11 Beta Test Plan
« Milestones | Fennec 11 Beta | » Fennec 11 Beta 1
Overview
The goal of this Overall Test Plan is to lay out our testing strategy, determine who will own certain test areas and when they will do it and, finally, track the status. All of our releases are tested off of the "Fennec 11 Beta Catch-All Test Run" on the Litmus TCM.
Project contacts
PM: Erin Lancaster (erinlancaster)
Dev Lead: Mark Finkle (mfinkle)
Build: John Oduinn (joduinn)
QA: Kevin Brosnan (kbrosnan)
Schedule
- Start Date: 1/31/2012
- End Date: 3/31/2012
Bugs in Release
Beta Testplans
« Milestones | Fennec 11 Beta | » Fennec 11 Beta 1
Build Location and IDs
- Go to the candidates folder in our ftp directory
- Go to the "latest-mozilla-beta" folder
- Download and install the latest candidate build onto your Android phone/device
Features Enabled
Test Areas
Smoketests
QA Task | Person/Group | How Often? |
Smoketests | Waverley | Once |
Lite verification tests (or smoketests) will be first run when the builds are ready. Tests are available on litmus under the Fennec 9.0 Test Suite, and the tablet version here. In any case of failure in any Smoketest, blockers need to be raised ASAP before proceeding to the BFTs.
Results details can be found in Waverley's results wiki.