« Fennec 14 Beta 2 | Fennec 14 Beta 3 | » Fennec 14 Beta 4
Native Fennec 14 Beta 3 Test Plan
Smoketests
QA Task
|
Person/Group
|
How Often?
|
Smoketests
|
Softvision
|
Every Beta
|
Lite verification tests (or smoketests) will be first run when the builds are ready. Tests are available on litmus under the Fennec Phone 14 Test Suite, and Fennec Tablet 14 Test Suite. In any case of failure in any Smoketest, blockers need to be raised ASAP before proceeding to the BFTs.
Assigned
|
Device
|
Completed
|
Results
|
Softvision
|
Galaxy SII 2.3.4
|
May 25th, 2012
|
PASS
|
Detailed Smoketest results
BFTs and Exploratory for Features
QA Task
|
Person/Group
|
How Often?
|
BFTs
|
Softvision
|
Once
|
BFTs are a more comprehensive set of litmus tests that cover functional testing of features that have landed on Fennec 14. Tests are available on litmus under the Fennec Phone 14 Test Suite, and Fennec Tablet 14 Test Suite.
Assigned
|
Device
|
Completed
|
Results
|
Softvision
|
Galaxy Nexus 4.0.2/LG Optimus 2X 2.2.2/HTC Desire Z 2.3.3
|
May 25th, 2012
|
PASS
|
Detailed BFT results
Android Permissions Testing
QA Task
|
Person/Group
|
How Often?
|
Verification
|
Softvision
|
Every Beta
|
Assigned
|
Device
|
Completed
|
Results
|
Softvision
|
Samsung Galaxy Nexus 4.0.2
|
May 25th, 2012
|
PASS
|
Detailed Android Permissions Testing Results
Verify permissions between what is currently on the store and with this beta build candidate. Details: Android Permissions
L10N Spot Checks
QA Task
|
Person/Group
|
How Often?
|
Spot Check Verification
|
SoftVision
|
Every Beta
|
Light testing on featured locales to ensure strings fit the space allotted and there are no entity errors from missing or corrupt localizations.
Assigned
|
Device
|
Completed
|
SoftVision
|
Samsung Galaxy Nexus 4.0.2
|
May, 24th, 2012
|
Detailed L10N matrix
Bug Fix Verification
QA Task
|
Person/Group
|
How Often?
|
Verification
|
Softvision
|
Every Beta
|
Areas for exploratory testing
- Sync
- Graphics
- New locales for beta 3