FirefoxOS/DeviceQA/2015-02-09WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W07 (02/09~02/13)
    • MCTS v2.2
      • implement device handler
      • migrate architecture
    • Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
  • Week W08 (02/16~02/20)
    • MCTS v2.2
    • Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
    • Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
Alison
  • Week W07 (02/09~02/13)
    • Bugs verified
    • v2.2 test cases review (Bug 911055 - [Dialer]DuT doesn't allow to dial a <<pause>>)
    • Regression test for NFC on Nexus-5-L
    • Create jobs on Jenkins for Nexus-5-L v2.2 MTBF testing
  • Week W08 (02/16~02/20)
    • Bugs verify
    • v2.2 NFC test cases update (according to reviewer's suggestion)
Askeing
  • Week W07 (02/09~02/13)
    • Android L Porting. Bug 1094121.
    • MWC Demo. Bug 1126155.
    • MCTS description work. (implement image part)
  • Week W08 (02/16~02/20)
    • Android L Porting. Bug 1094121.
    • MWC Demo. Bug 1126155.
    • MCTS description work. (implement image part)
Cynthia
  • Week W07 (02/09~02/13)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • [Stingray] Create test cases, file bugs and verify bugs for 2015 Demo
  • Week W08 (02/16~02/20)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Take care of Flame KK v2.2 automation reports
    • [Stingray] Create test cases, file bugs and verify bugs for 2015 Demo
Edward
  • Week W07 (02/09~02/13)
    • Prepare power consumption test cases for all FxOS Apps
    • Debug and keep discuss with Eli to resolve how to add new devices in Rapter
  • Week W08 (02/16~02/20)
    • Built up raptor in LAB
    • Set up automated task for raptor
Eric
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Gerry
  • Week W07 (02/09~02/13)
    • v2.2 feature testing
    • QAnalyst bugs verification
    • Nexus 5 L automation environment setup - finished
  • Week W08 (02/16~02/17)
    • v2.2 feature testing
    • QAnalyst/MGSEI bugs verification
Hermes
  • Week W07 (02/09~02/13)
    • Handle [E.Me Transition] tasks
    • Keep L porting test on nexus 5
    • Review NFC Test cases
    • Monitor v2.2+ System FE Bugs
      • Create test cases for short_name support on FxOS (Bug 1001861)
      • Perform QA sign off for Task Manager features
  • Week W08 (02/16~02/20)
    • Handle [E.Me Transition] tasks
    • Monitor v2.2+ System FE Bugs
      • Perform QA sign off for App-grouping, Smart Collections, and Rocketbar & Search Suggestions feature landing (FL milestone).
Hubert
  • Week W07 (02/09~02/13)
    • Follow up Woodduck tasks and issues
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Audit issue quality filed by Marigold
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA
    • Study gaia-ui-test for data migration
  • Week W08 (02/16~02/20)
    • Follow up Woodduck tasks and issues
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Audit issue quality filed by Marigold
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA
    • Support OPEN2 MWC build test
Mike
  • Week W07 (02/09~02/13)
    • v2.1 bug work
    • EWC tasks
    • Power consumption lab survey
  • Week W08 (02/16~02/20)
    • v2.1 bug work
    • MWC Open2 build verification
Owen Ouyang
  • Week W07 (02/09~02/13)
  • Week W08 (02/16~02/20)
Paul
  • Week W07 (02/09~02/13)
    • Trial run on v2.2
  • Week W08 (02/16~02/20)
    • Memory report for new operation stuff

-- backlog --

    • poc for bisect tool
    • Chaos Monkey for b2g (random process killer)
    • Create daemon to emit locking status
    • Modifying crash report patch based on review (pending to b2gDevice in mozbase)
    • Followup live test run stream
    • Datazilla integration
    • Memory stress test
    • Revive daily mtbf test
Shing
  • Week W07 (02/09~02/13)
    • Clarify 2.2 metrics scope with RD
    • Metrics test cases design
    • MozTrap API Expansion
    • Reach out to the community for MozTrap UI work
  • Week W08 (02/16~02/20)
    • Metrics Case
    • Send reports on behalf of Eric
    • Take care of automation report if needed
    • MozTrap API
Teri
  • Week W07 (02/09~02/13)
    • V2.2 Cgroup
      • Design test cases for cgroup testing
    • V2.2 Bluedroid
      • RD will run tests before FL, QA will start testing after FL
    • Organize new hire's guide
  • Week W08 (02/16~02/20)
    • V2.2 Cgroup
      • Draft test plan for cgroup testing
      • Send test plan to RD for comment/review
      • Research possible failure scenarios in bugzilla
      • Write test cases in MozTrap
    • V2.2 Bluedroid
      • RD will run tests before FL, QA will start testing after FL
    • Organize new hire's guide
Walter
  • Week W07 (02/09~02/13)
    • Lab works
      • Nexus5 L testing environment
    • encountering several bugs during MTBF
      • Rocket bar bug
      • crash bug
      • Wifi bug
    • Nagios survey
  • Week W08 (02/16~02/20)
    • Lab works
      • Nexus5 L testing environment
    • Bugs
      • Nexus5 Keyboard bug
      • crash bug
William Hsu
  • Week W07 (02/09~02/13)
    • [Device] Assist Dolphin v2.1 related stuff.
      • Bug triage and meetings
      • Performance measurement
    • [Device] Assist Flame related stuffs
      • Gaia UI test on v2.0 Build
      • Gaia UI test on v2.1 Build
    • [Device][Outsourcing]
      • Troubleshooting for automation fail cases
      • Assist performance test
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
  • Week W08 (02/16~02/20)
    • [Device][Outsourcing]
      • Troubleshooting for automation fail cases
      • Assist performance test
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
      • PTO on 02/17
      • Chinese New Year. (2/18~2/23)