FirefoxOS/DeviceQA/2015-02-16WeeklyReport

From MozillaWiki
Jump to: navigation, search

Last week | Next week

Name Done Plan
Al
  • Week W08 (02/16~02/20)
    • MCTS v2.2
    • Bug 1124899 - [2.1] Hanging up a second call while the first is held no longer causes the first call to become active
    • Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
  • Week W09 (02/23~02/27)
    • MCTS v2.2
    • Bug 1116878 - [2.1] Most bluetooth tests fail with "app = null" error
Alison
  • Week W08 (02/16~02/20)
    • Bugs verify
    • v2.2 NFC test cases update (according to reviewer's suggestion)
  • Week W09 (02/23~02/27)
    • Bugs verify
    • SE API initial test on Nexus-5-L (master build)
Askeing
  • Week W08 (02/16~02/20)
    • Android L Porting. Bug 1094121.
    • MWC Demo. Bug 1126155.
    • MCTS description work. (implement image part)
  • Week W09 (02/23~02/27)
    • MCTS issues fixing.
    • Bug 1133394 - Add image support for semiauto tests
    • Bug 1135094 - "make test" fails with "No module named semiauto"
Cynthia
  • Week W08 (02/16~02/20)
    • Take care of Flame KK v2.1 automation reports (Daily)
    • Take care of Flame KK v2.2 automation reports
    • [Stingray] Create test cases, file bugs and verify bugs for 2015 Demo
  • Week W09 (02/23~02/27)
    • Take care of Flame KK v2.1 automation reports
    • Take care of Flame KK v2.2 automation reports
    • Assist Edward in setting Raptor (TPE Lab)
Edward
  • Week W08 (02/16~02/20)
    • Built up raptor in LAB
    • Set up automated task for raptor
Eric
  • Week W08 (02/16~02/20)
Gerry
  • Week W08 (02/16~02/20)
    • v2.2 feature testing
    • QAnalyst bugs verification/follow-up
  • Week W09 (02/23~02/27)
    • v2.2 feature testing
    • QAnalyst bugs verification/follow-up
Hermes
  • Week W08 (02/16~02/20)
    • Handle [E.Me Transition] tasks
    • Monitor v2.2+ System FE Bugs
      • Perform QA sign off for App-grouping, Smart Collections, and Rocketbar & Search Suggestions feature landing (FL milestone).
  • Week W09 (02/23~02/27)
    • Handle [E.Me Transition] tasks
    • Keep L porting test on nexus 5
    • Monitor v2.2+ System FE Bugs
      • Create test cases for short_name support on FxOS (Bug 1001861)
    • Start Moztrap enhancement if have time
Hubert
  • Week W08 (02/16~02/20)
    • Follow up Woodduck tasks and issues
    • Review issues filed by Marigold
    • Woodduck triage meeting
    • Outsourcing weekly meeting
    • Audit issue quality filed by Marigold
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA
    • Support OPEN2 MWC build test
  • Week W09 (02/24~02/27)
    • Follow up Woodduck tasks and issues
    • Outsourcing weekly meeting
    • Bug work for Marigold submitted bugs
    • Modify and create test cases for In-House FOTA
Mike
  • Week W08 (02/16~02/20)
    • v2.1 bug work
    • MWC Open2 build verification
    • Flame nightly build verification
  • Week W09 (02/24~02/26)
    • v2.1 bug work
    • Flame nightly build verification
    • New GPS SUPL server test
Owen Ouyang
  • Week W08 (02/16~02/20)
Paul
  • Week W08 (02/16~02/20)
    • Memory report for new operation stuff
  • Week W09 (02/24~02/26)
    • Bug fix for customizing gaia
    • Doc for mtbf-operation
    • Enrich mtbf driver doc

-- backlog --

  • Chaos Monkey for b2g (random process killer)
  • Create daemon to emit locking status
  • Modifying crash report patch based on review (pending to b2gDevice in mozbase)
  • Followup live test run stream
  • Datazilla integration
  • Memory stress test
  • Revive daily mtbf test
Shing
  • Week W08 (02/16~02/20)
    • Metrics Case
    • Send reports on behalf of Eric
    • Take care of automation report if needed
    • MozTrap API
  • Week W09 (02/23~02/27)
    • Metrics testing
    • Metrics test cases
    • Prepare MozTrap sharing
    • Cleanup MozTrap code and documentation to attract community developer
Teri
  • Week W08 (02/16~02/20)
    • V2.2 Cgroup
      • Drafted test plan for cgroup testing
      • Sent test plan to RD for comment/review (feedback was positive)
      • Researched possible failure scenarios in bugzilla
      • Finished creating test cases in MozTrap
    • V2.2 Bluedroid
      • RD will run tests before FL, QA will start testing after FL
      • 3/2 - 3/6
    • Organize new hire's guide
  • Week W09 (02/23~02/27)
    • V2.2 Cgroup
      • Start testing
    • V2.2 Bluedroid
      • On track to start testing next week (3/2 - 3/6)
    • Follow up on bugs opened by QAnalyst
Walter
  • Week W08 (02/16~02/20)
    • Lab works
      • Nexus5 L testing environment
    • Bugs
      • Nexus5 Keyboard bug
      • crash bug
  • Week W09 (02/23~02/27)
    • Lab works
    • Nexus 5 related issue trouble-shooting
    • Bugs
    • mtbf-operation debugging
William Hsu
  • Week W08 (02/16~02/20)
    • [Device][Outsourcing]
      • Troubleshooting for automation fail cases
      • Assist performance test
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
      • PTO on 02/17
      • Chinese New Year. (2/18~2/23)
  • Week W09 (02/23~02/27)
    • [Device]
      • Bug work
      • Investigate v2.2 performance regression (Request from Bobby)
    • [Outsourcing]
      • Investigate automation fail cases
      • RTL test case review
      • Dispatch bugs of free test
    • Others,
      • Support PluotSorbet
      • Setup automation test environment for v2.2
      • Chinese New Year. (2/23)
      • 228 Peace Memorial Day. (2/27)