L10n:Weekly/2012-07-04
Meeting Details
- Time and location: Wednesday, 8 AM PST, conf bridge 206
- irc.mozilla.org #l10n-drivers for back-channel
« previous meeting — index – next week » create?
Previous Action Items
carry-overs
Meeting Notes
- Notetaker:
- Attendees:
- Put your talking points here.
- contribution path: l10n/SUMO collaboration (https://l10n.etherpad.mozilla.org/06-2012-contribute-sprint lines 3-14)
Action Items
carry-overs
New locales updates
Acholi (ach)
Current build channel: aurora
Blocks to release: 3 productization bugs, activity on aurora, stop hand-holding with San James
Brief summary of interactions with the team from the past week: Waiting for activity in bugs - no response
Action items (provide assignments): Milos set-up a call with Dwayne - figure out the next steps.
Fulah (ff)
Current build channel: beta
Blocks to release: positive community feedback
Brief summary of interactions with the team from the past week: Nothing to do.
Action items (provide assignments): Wait for a week before merge and then talk to Ibrahima/Dwayne.
Kazakh (kk)
Current build channel: beta
Blocks to release: 2 productization bugs and positive community feedback.
Brief summary of interactions with the team from the past week: No response in bug.
Action items (provide assignments): Milos to ping once more in bugs and email Timur.
Malay (ms)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week: Help Syafiq with first hg commit and sign-off
Action items (provide assignments): Check with IT about auth errors
Burmese (my)
Current build channel:
Blocks to release:
Brief summary of interactions with the team from the past week: Submitted code review for first landing.
Action items (provide assignments): Finish review and have first landing. Get commit rights to Zinmin
Maithili (mai)
Current build channel: beta
Blocks to release: 1 productization bug(multiple access keys), catching up with missing strings on aurora/beta, positive community feedback
Brief summary of interactions with the team from the past week: RSS feed readers bug resolved.
Action items (provide assignments): Ping Rajesh about the missing strings.
Mongolian (mn)
Current build channel: beta
Blocks to release: lots of missing strings on aurora, 3 bugs, several web-parts bugs
Brief summary of interactions with the team from the past week: None
Action items (provide assignments): Send an email to Channy Yun(Mongolian mentor) and see how current contributor Harry is doing, and whether we can find someone else to help him out with localization.