QA/Fennec/Milestones/9.0/Beta
Contents
Fennec 9.0 Beta Test Plan
« Milestones | Fennec 9.0 Beta | » Fennec 9.0 Beta 1
Overview
The goal of this Overall Test Plan is to lay out our testing strategy, determine who will own certain test areas and when they will do it and, finally, track the status. All of our releases are tested off of the "Fennec 9.0 Beta Catch-All Test Run" on the Litmus TCM. For more information about Fennec 9.0, take a look at the mobile team's Feature Planning page.
Project contacts
PM: Erin Lancaster (erinlancaster)
Dev Lead: Mark Finkle (mfinkle)
Build: John Oduinn (joduinn)
QA: Ioana Chiorean (Ioanachiorean), Aaron Train (AaronMT)
Schedule
- Start Date: 11/08/2011
- End Date: 12/20/2011
Bugs in Release
Beta Testplans
« Milestones | Fennec 9.0 Beta | » Fennec 9.0 Beta 1
- Fennec 9.0 Beta 1
- Fennec 9.0 Beta 2
- Fennec 9.0 Beta 3
- Fennec 9.0 Beta 4
- Fennec 9.0 Beta 5
- Fennec 9.0 Beta 6
- Fennec 9.0 RC1
Build Location and IDs
- Go to the candidates folder in our ftp directory
- Go to the "latest-mozilla-beta" folder
- Download and install the latest 9.0b-candidate build onto your Android phone/device
Features Enabled
Feature | Status | Owner |
Camera API Support | andreea.pod@softvision.ro | |
Tablet UI | SoftVision | |
HTML5 Form Validation | SoftVision |
Test Areas
Smoketests
QA Task | Person/Group | How Often? |
Smoketests | Waverley | Once |
Lite verification tests (or smoketests) will be first run when the builds are ready. Tests are available on litmus under the Fennec 9.0 Test Suite, and the tablet version here. In any case of failure in any Smoketest, blockers need to be raised ASAP before proceeding to the BFTs.
Results details can be found in Waverley's results wiki.